Wednesday, April 1, 2009

Project Reform

This is a project launched by Cochin after the short conflict with Wulaishen to strengthen the nation. A phased construction plan of following fleet to introduce ship building technology to new shipyards across Cochin.
This is the roster of Phase One which attained fruition on Nov 1 2008.
AIRCRAFT CARRIER 2
HELICOPTER CARRIER 1
CRUISER 6
DESTROYER 14
FRIGATES 30
ATTACK SUBMARINES-X 4
ATTACK SUBMARINES-Z 4
MIDGET SUBMARINES 50
MISSILE BOATS 50
JET BOAT 20
FLEET OILER 3
REPLENISHMENT SHIP 3
MINESWEEPER 5
LST 4
OFFSHORE PATROL VEHICLE 4
INSHORE PATROL VEHICLE 50
TOTAL 250

The second phase of Project Reform was launched shortly after Phase one. This phase saw the introduction of the UACV fighter and bomber.
This is the roster of PR II.
HELICOPTER CARRIER 3
MISSILE SUBMARINE 6
ATTACK SUBMARINE- Z 6
DESTROYER 12
AMMUNITION SHIP 10
OILER 3
REPLENISHMENT SHIP 3
ASSAULT HOVERCRAFT 5

UACV 500
UACV- BOMBER 100
AERIAL ARTILLERY PLATFORM 20
RADar SAT 5
COMunication SAT 5
Strategic Reconnaissance SAT 10
155 mm MS SPG 60
110 MM MS SPG 100
100 MM MS MRLS 50
50 MM MS 5000
25 MM MS 6000
15.56 MM MS AAA 10000
7.62 MM MS HMG 12000
5.56 MM MSAR 30000
9 MM MS SMG 40000
9 MM MS PISTOL 20000

This was amongst the last of RP designed for NS.

No comments:

Post a Comment